  Projects Completed During 2000 - 2005
 
TITLE OF THE PROJECT
PROJECT START YEAR
PROJECT END YEAR
EVALUATION OF CONDITION OF SELECTED ROADS IN GWALIAR DIST.(CBI ENQUIRY)
2004
2005
DESIGN, QUALITY CONTROL AND SUPERVISION OF CONCRETE ROAD FROM SOHNA ROAD TO ELSON COTTON MILL CROSSING & ROAD BETWEEN .SECTOR 22, 23 & 24 FARIDABAD
2004
2005
INVESTIGATION FOR CAUSES OF PREMATURE DISTRESS AND NEEDED REMEDIAL MEASURES FOR ROAD ALONG BAGGI, SUNDER NAGAR HYDEL CHANNEL
2004
2005
QUALITY AND PERFORMANCE EVALUATION OF RIGID PAVEMENTS OF ADDITIONAL TWO CONTRACT PACKAGES KU-IV AND KU-V IN THE STATE OF RAJASTHAN (UNDER GQ PROJECTS)
2004
2005
PAVEMENT DESIGN FOR WIDENING OF ROADS AT SARAI KALE KHAN INTERSECTION-ROAD TOWARDS MAHARANI BAGH - ROAD TOWARDS NIZAMUDDIN BRIDGE
2004
2005
GROUND IMPROVEMENT MEASURES FOR WIDENING OF INDUSTRIAL BYE-PASS ROAD AT VISAKHAPATNAM
2004
2005
INVESTIGATION & RECOMMENDATION OF SUITABLE CORRECTIVE MEASURES FOR PREVENTION OF ROAD CUT SLOPES ALONG ACCESS ROAD FROM NAIHAR VILLAGE TO BRIDGE POINT, KOLDAM, HP
2004
2005
STRENGTHENING OF EXISTING CONCRETE SURFACE OF SPEED TRACK PAVING AT HEAVY VEHICLE FACTORY, AVADI, CHENNAI
2004
2005
RESTORATION OF DAMAGES TO APPROACHES OF HIGH LEVEL BRIDGE ACROSS SIRSA NADI ON NH-21 NEAR ROPAR
2004
2005
FEASIBILITY STUDY FOR CONSTRUCTION OF PEDESTRIAN SUBWAY AT KALIDAS MARG BETWEEN EAST AND WEST MOTI BAGH IN KAROL BAGH
2004
2005
INVESTIGATION FOR EVALUATION OF QUALITY OF POLYMER MODIFIED BITUMEN USED IN AHMEDABAD-VADODARA EXPRESSWAY
2004
2005
UTILISATION OF KIBERLITE TAILING IN ROAD WORKS - TECHNICAL GUIDANCE FOR CONSTRUCTION OF TEST TRACK
2004
2005
INVESTIGATION FOR DESIGN OF FEAXIBLE PAVEMENT FOR MOVEMENT OF 100 TONNES & 350 TONNES CRANE
2004
2005
INVESTIGATION FOR REMEDIAL MEASURES OF EXISTING OLD MASTIC ASPHALT SURFACE ON THE DECK OF SECOND HOOGLY BRIDGE (VIDYASAGAR SETU), KOLKATA
2004
2005
THIRD PARTY QUALITY ASSURANCE OF IMPROVING STRENGTHENING OF INTERNAL ROADS IN ASHOK VIHAR
2004
2005
  Records 1 to 15 of 353
Next Last