Projects of Bridges and Structures

Title Sponsor/Client
B-26 Application of advanced Composite Fibre Reinforced with plastic materials in strengthening/rehabilitation of concrete bridge MOST
B-32 Usage of HPC for Pavement & Bridges made with indigenously available Material MOST
Assessment of structural health and preparation of rehabilitation scheme of distressed central Ganga canal bridge on SH-14 near Garmukteshwar (U.P) U.P. Bridge Corporation, Ghaziabad
Assessment of Load Carrying capacity of recently rehabilitated central Ganga canal bridge on SH-14, Garhmukteswar U.P. Bridge Corporation, Ghaziabad
Long term performance monitoring of I.T.O bridge (2001-02) PWD, Delhi
MCD, Delhi MCD
Long term performance monitoring of I.T.O bridge (2003-04) PWD, Delhi
Performance Monitoring of Ganga Bridge, Varanasi (2002-03) NHAI
State of Art Report on development of Bridge Bearings IRC, Delhi
Detailed investigation and rehabilitation of Ravi and Basanter bridge on P-J road, NH-IA CPWD, Punjab
Evaluation of two no NHAI, Ghaziabad
Design of Budhia Nallah culvert and Retaining wall at AFNHB project Air force naval housing board, New Delhi
Development of a critical infrastructure information system for maintenance of bridges in GIS environment Limited to Ghaziabad Distt. DST, New Delhi
Evaluation of the steel and arch bridge for increased axle load of freight wagons on iron ore routes on southern- eastern railway Southern-Eastern Railway
Evaluation and Monitoring of two bridges between Panipat-Ambala-Srihind section for Increased axle load of Freight Wagons Northen Railway, New Delhi
Evaluation and Monitoring of two bridges between for Increased axle load of Freight Wagons on Iron ore routes of Eastern Railway, Asansol Eastern Railway, Kolkatta
Quality assurance and health monitoring of a 6-lane road way bridge over the Palam drain at Dwarka, New Delhi DDA, Delhi
Construction of bridge over Gurgaon canal feeder near RD-42848, Design and quality control of a six lane bridge across Gurgaon canal feeder near RD-42848 WS division, Faridabad
Long term performance monitoring of I.T.O bridge(2004-05) and (2005-06) PWD, Delhi
Evaluation of the Elastomeric bridge bearing NHAI, Kolkatta
Load testing of span P-5 of Zuari Bridge, Goa on NH-17 PWD, Goa
Distress Diagnostic performance evaluation and bridge management system for concrete bridges, Phase-II, Development of one prototype of the visual inspection unit DST, New Delhi
B-25px Study for Aerodynamic stability of cable stayed bridge deck MORTH, New Delhi
Instrumentation and Evaluation of Ganjal Bridge on western-central railway western-central railway
Instrumentation and Evaluation of Bhojakho Bridge on western-central railway western-central railway
Instrumentation and Evaluation of Kalisindh Bridge on western-central railway western-central railway
Instrumentation and Evaluation of Rohari Bridge on Western Central Rly. Western Central Railway
Assessment of quality of concrete in the vicinity of and diaphragm walls of Box girder in span P-2 and P-3 of the existing two lane grade separator on NH-24A, Lucknow PWD, Lucknow
Design of Prefab/Precast concrete segmental cross drainage cum road way over Palam drain (Sitapuri) DDA, Delhi
Performance evaluation of four span of grade separator and two span of ROB through load testing, Lucknow UP, PWD