1 |
Study of Corrosion Susceptibility of steel Reinforcement Protected with Anti-Corrosive Coating /Special treatment in Ordinary & HPC (B-42) |
MOSRTH |
|
2 |
Distress diagnostic performance evaluation and bridge management system for concrete bridge |
DST, New Delhi |
|
3 |
Assessment of Load Carying Bailey Bridge |
THDC |
|
4 |
Repair and Rehabilitation of Old ITO Bridge over River Yamuna |
PWD, Delhi |
|
5 |
Proof Checking of Structural Design of two Pedestrian Foot over Bridge for PWD, Delhi |
M/s Tandon Consultant Pvt, Ltd. New Delhi |
|
6 |
Creation of complete range of Independent testing facility for Expansion Joints at CRRI, New Delhi |
MORTH, New Delhi |
|
7 |
Checking of Construction Work of Pedestrian Footover Bridge over Bhishm Pitamaha Marg near Jawahar Lal Nehru Stadium, New Delhi |
MCD, Delhi |
|
8 |
Remedial Measures/Rehabilitation of Bridge at RD 21260m of Supplementary Drain (Sultanpuri Bridge), Delhi |
I & F Control, Govt. Of NCT, Delhi |
|
9 |
Strengthening measures for Kalimati Road Bridge, Jamshedpur TISCO |
Jamshedpur |
|
10 |
Checking of Construction work during Rehabilitation of flyover aat Bhisham Pitamaha Marg, Sewa Nagar, New Delhi |
MCD, Delhi |
|
11 |
Determination of creep of M-60 concrete through laboratory investigation |
Gammon India Ltd |
|
12 |
Assessing condition of distressed bridge at Kangsabati on NH-6 (WB) ICT PVT LTD |
New Delhi |
|
13 |
Performance evaluation of four span of grade separator and two span of ROB through load testing, Lucknow |
UP, PWD |
|
14 |
Design of Prefab/Precast concrete segmental cross drainage cum road way over Palam drain (Sitapuri) |
DDA, Delhi |
|
15 |
Instrumentation and Evaluation of Rohari Bridge on Western Central Rly. |
Western Central Railway |
|
16 |
Assessment of quality of concrete in the vicinity of and diaphragm walls of Box girder in span P-2 and P-3 of the existing two lane grade separator on NH-24A, Lucknow |
PWD, Lucknow |
|
17 |
Instrumentation and Evaluation of Kalisindh Bridge on western-central railway |
western-central railway |
|
18 |
Instrumentation and Evaluation of Bhojakho Bridge on western-central railway |
western-central railway |
|
19 |
Instrumentation and Evaluation of Ganjal Bridge on western-central railway |
western-central railway |
|
20 |
Distress Diagnostic performance evaluation and bridge management system for concrete bridges, Phase-II, Development of one prototype of the visual inspection unit |
DST, New Delhi |
|
21 |
B-25px Study for Aerodynamic stability of cable stayed bridge deck |
MORTH, New Delhi |
|
22 |
Load testing of span P-5 of Zuari Bridge, Goa on NH-17 |
PWD, Goa |
|
23 |
Evaluation of the Elastomeric bridge bearing |
NHAI, Kolkatta |
|
24 |
Construction of bridge over Gurgaon canal feeder near RD-42848, Design and quality control of a six lane bridge across Gurgaon canal feeder near RD-42848 |
WS division, Faridabad |
|
25 |
Long term performance monitoring of I.T.O bridge(2004-05) and (2005-06) |
PWD, Delhi |
|
26 |
Quality assurance and health monitoring of a 6-lane road way bridge over the Palam drain at Dwarka, New Delhi |
DDA, Delhi |
|
27 |
Evaluation and Monitoring of two bridges between for Increased axle load of Freight Wagons on Iron ore routes of Eastern Railway, Asansol |
Eastern Railway, Kolkatta |
|
28 |
Evaluation and Monitoring of two bridges between Panipat-Ambala-Srihind section for Increased axle load of Freight Wagons |
Northen Railway, New Delhi |
|
29 |
Evaluation of the steel and arch bridge for increased axle load of freight wagons on iron ore routes on southern- eastern railway |
Southern-Eastern Railway |
|
30 |
Design of Budhia Nallah culvert and Retaining wall at AFNHB project |
Air force naval housing board, New Delhi |
|
31 |
Development of a critical infrastructure information system for maintenance of bridges in GIS environment Limited to Ghaziabad Distt. |
DST, New Delhi |
|
32 |
Evaluation of two no |
NHAI, Ghaziabad |
|
33 |
Detailed investigation and rehabilitation of Ravi and Basanter bridge on P-J road, NH-IA |
CPWD, Punjab |
|
34 |
State of Art Report on development of Bridge Bearings |
IRC, Delhi |
|
35 |
Performance Monitoring of Ganga Bridge, Varanasi (2002-03) |
NHAI |
|
36 |
Long term performance monitoring of I.T.O bridge (2003-04) |
PWD, Delhi |
|
37 |
MCD, Delhi |
MCD |
|
38 |
Long term performance monitoring of I.T.O bridge (2001-02) |
PWD, Delhi |
|
39 |
Assessment of Load Carrying capacity of recently rehabilitated central Ganga canal bridge on SH-14, Garhmukteswar |
U.P. Bridge Corporation, Ghaziabad |
|
40 |
Assessment of structural health and preparation of rehabilitation scheme of distressed central Ganga canal bridge on SH-14 near Garmukteshwar (U.P) |
U.P. Bridge Corporation, Ghaziabad |
|
41 |
B-32 Usage of HPC for Pavement & Bridges made with indigenously available Material |
MOST |
|
42 |
B-26 Application of advanced Composite Fibre Reinforced with plastic materials in strengthening/rehabilitation of concrete bridge |
MOST |