Projects of Bridge Engineering and Structures Division

S.No. Title Sponsor/Client  
1 Study of Corrosion Susceptibility of steel Reinforcement Protected with Anti-Corrosive Coating /Special treatment in Ordinary & HPC (B-42) MOSRTH  
2 Distress diagnostic performance evaluation and bridge management system for concrete bridge DST, New Delhi  
3 Assessment of Load Carying Bailey Bridge THDC  
4 Repair and Rehabilitation of Old ITO Bridge over River Yamuna PWD, Delhi  
5 Proof Checking of Structural Design of two Pedestrian Foot over Bridge for PWD, Delhi M/s Tandon Consultant Pvt, Ltd. New Delhi  
6 Creation of complete range of Independent testing facility for Expansion Joints at CRRI, New Delhi MORTH, New Delhi  
7 Checking of Construction Work of Pedestrian Footover Bridge over Bhishm Pitamaha Marg near Jawahar Lal Nehru Stadium, New Delhi MCD, Delhi  
8 Remedial Measures/Rehabilitation of Bridge at RD 21260m of Supplementary Drain (Sultanpuri Bridge), Delhi I & F Control, Govt. Of NCT, Delhi  
9 Strengthening measures for Kalimati Road Bridge, Jamshedpur TISCO Jamshedpur  
10 Checking of Construction work during Rehabilitation of flyover aat Bhisham Pitamaha Marg, Sewa Nagar, New Delhi MCD, Delhi  
11 Determination of creep of M-60 concrete through laboratory investigation Gammon India Ltd  
12 Assessing condition of distressed bridge at Kangsabati on NH-6 (WB) ICT PVT LTD New Delhi  
13 Performance evaluation of four span of grade separator and two span of ROB through load testing, Lucknow UP, PWD  
14 Design of Prefab/Precast concrete segmental cross drainage cum road way over Palam drain (Sitapuri) DDA, Delhi  
15 Instrumentation and Evaluation of Rohari Bridge on Western Central Rly. Western Central Railway  
16 Assessment of quality of concrete in the vicinity of and diaphragm walls of Box girder in span P-2 and P-3 of the existing two lane grade separator on NH-24A, Lucknow PWD, Lucknow  
17 Instrumentation and Evaluation of Kalisindh Bridge on western-central railway western-central railway  
18 Instrumentation and Evaluation of Bhojakho Bridge on western-central railway western-central railway  
19 Instrumentation and Evaluation of Ganjal Bridge on western-central railway western-central railway  
20 Distress Diagnostic performance evaluation and bridge management system for concrete bridges, Phase-II, Development of one prototype of the visual inspection unit DST, New Delhi  
21 B-25px Study for Aerodynamic stability of cable stayed bridge deck MORTH, New Delhi  
22 Load testing of span P-5 of Zuari Bridge, Goa on NH-17 PWD, Goa  
23 Evaluation of the Elastomeric bridge bearing NHAI, Kolkatta  
24 Construction of bridge over Gurgaon canal feeder near RD-42848, Design and quality control of a six lane bridge across Gurgaon canal feeder near RD-42848 WS division, Faridabad  
25 Long term performance monitoring of I.T.O bridge(2004-05) and (2005-06) PWD, Delhi  
26 Quality assurance and health monitoring of a 6-lane road way bridge over the Palam drain at Dwarka, New Delhi DDA, Delhi  
27 Evaluation and Monitoring of two bridges between for Increased axle load of Freight Wagons on Iron ore routes of Eastern Railway, Asansol Eastern Railway, Kolkatta  
28 Evaluation and Monitoring of two bridges between Panipat-Ambala-Srihind section for Increased axle load of Freight Wagons Northen Railway, New Delhi  
29 Evaluation of the steel and arch bridge for increased axle load of freight wagons on iron ore routes on southern- eastern railway Southern-Eastern Railway  
30 Design of Budhia Nallah culvert and Retaining wall at AFNHB project Air force naval housing board, New Delhi  
31 Development of a critical infrastructure information system for maintenance of bridges in GIS environment Limited to Ghaziabad Distt. DST, New Delhi  
32 Evaluation of two no NHAI, Ghaziabad  
33 Detailed investigation and rehabilitation of Ravi and Basanter bridge on P-J road, NH-IA CPWD, Punjab  
34 State of Art Report on development of Bridge Bearings IRC, Delhi  
35 Performance Monitoring of Ganga Bridge, Varanasi (2002-03) NHAI  
36 Long term performance monitoring of I.T.O bridge (2003-04) PWD, Delhi  
37 MCD, Delhi MCD  
38 Long term performance monitoring of I.T.O bridge (2001-02) PWD, Delhi  
39 Assessment of Load Carrying capacity of recently rehabilitated central Ganga canal bridge on SH-14, Garhmukteswar U.P. Bridge Corporation, Ghaziabad  
40 Assessment of structural health and preparation of rehabilitation scheme of distressed central Ganga canal bridge on SH-14 near Garmukteshwar (U.P) U.P. Bridge Corporation, Ghaziabad  
41 B-32 Usage of HPC for Pavement & Bridges made with indigenously available Material MOST  
42 B-26 Application of advanced Composite Fibre Reinforced with plastic materials in strengthening/rehabilitation of concrete bridge MOST