-   
  Mobile Bridge Inspection Unit (MBIU)
The Mobile Bridge Inspection Unit (referred as MBIU) is an Electro-mechanically driven Articulated Structure mounted on a vehicle (a truck) as an aid towards proper inspection of bridges or similar infrastructures by enabling an inspection team of 3-4 persons carrying instruments access to the underside of bridge decks over flowing rivers or gorges.
 -   
  Utilization of Municipal Solid Waste (MSW) in Road embankment
About 65-75% of segregated Municipal Solid Wastes can be used for embankment construction.Leachate studies indicate that MSW is a non hazardous material as concentration of heavy metals is within the permissible limit.Typical design cross sections have been arrived for 3m and 5m height MSW embankment.
 -   
  India hails success of first ‘steel-slag road’
A stretch of six-lane road experimentally paved with slag from steel-making in India has been shown to weather the beating from thousands of heavy trucks even though the surface is 30% shallower than that of roads paved with natural aggregates. Slag is made up of impurities melted out of the ore during the steel-making process. The trial, guided by the Central Road Research Institute (CSIR-CRRI) and sponsored by ArcelorMittal Nippon Steel (AM/NS).
 
Important Links
- Recruitment of JSA & Junior Stenographer
 - News
 - Events
 - Tenders
 - Procurement Plan
 - Recruitment
 - Technology Profile
 - Right to Information Cell
 - Customer Feedback
 - Indian Highway Capacity Manual
 - CSIR-CRRI welcomes CSR Funds from Industries for R&D in Road Sector
 - Photo Galleries
 - CSIR Vision 2030 (pdf size: 7.4 MB)
 - CSIR India R&D Projects
 - CSIR Scientific ethics in CRRI
 - List of Promo Films for Events at IISF 2020
 - Booking of Test Services
 
Upcoming Events
-   
  
New Technology Initiatives including Waste Materials in road Construction 1 Dec 2025 to 5 Dec 2025
 -   
  
Quality Assurance, Health Assessment and Rehabilitation of Bridge 8 Dec 2025 to 12 Dec 2025
 -   
  
Geotechnical Investigation and Landslide Mitigation Measures For Highway Projects 15 Dec 2025 to 19 Dec 2025
 -   
  
Design, Construction and Quality Control In Flexible Pavements 29 Dec 2025 to 2 Jan 2026
 





        





































